Trojan Nuclear Power Plant Sign on April 22, 2006.
At the main entrance to the Trojan site stands this sign. This is not the original sign from when the plant was operational, which declared this the "Trojan Nuclear Power Plant" (though it does stand on the original pedestal). Now, it is simply the "Trojan Project" and Trojan Park is listed separately.
Trojan Nuclear Power Plant Sign on April 22, 2006.
This sign was intended to list the names of all the tenants PGE hoped to lure into the vacated office buildings after the plant closed.
Trojan Nuclear Power Plant Sign on April 22, 2006.
The only other name visible on this sign, on the BACK of one of the spaces, is Barrett Robotic Welding Services, a contractor that sealed up the generators during the plant's decommissioning.
Trojan Nuclear Power Plant Sign on April 22, 2006.
Note that the address of the Trojan Nuclear Power Plant is 71760 Columbia River Highway, Rainier, Oregon 97048.
Trojan Nuclear Power Plant Sign on April 22, 2006.
I found this picture of the original sign on this page.
Trojan Site Closure Sign on May 13, 2006.
This temporary sign was put up at the entrance to the site to announce that the site would be completely closed for several days for the implosion of the Cooling Tower.
View of the Trojan Nuclear Power Plant Cooling Tower from the Main Entrance on April 22, 2006.
Here is the view of the Cooling Tower from the Main Entrance to the Trojan Site.
View of the Trojan Nuclear Power Plant Cooling Tower from the Main Entrance on April 22, 2006.
Continue to Visitors Information Center…
No comments:
Post a Comment